When a building is connected incorrectly, its wastewater flows into the storm sewer and on to local waterways. I designed a system built on FPV drone technology that lets City crews detect these faults themselves, more safely and hygienically.
Role
Sole designer, from research to testing
Context
Water Department, City of Montréal
Year
2026
Tools
FreeCAD, SolidWorks, FPV drone electronics, 3D printing, laser fusion
Tens of thousands of dollarssaved by the City every year since it went into service in summer 2026, by relying less on outside firms.
Loading 3D model
Two modules, 33 partsDrag to rotate · hover a part
01 · Starting pointFully disassembled
A camera module and a UV lamp module, each on its own base.
02 · StructureOne tube carries it all
Batteries, electronics and the door fit into a single body.
03 · FasteningRepairable, no glue
Pins, screws and threaded inserts keep everything serviceable.
04 · Field-readyThe UV lamp turns on
It reveals the fluorescent tracer while the camera records.
From the field to a concept
I started by joining technicians on inspection days, then drove through every borough to document manhole types and dimensions.
My biggest challenge was finding cameras and UV lamps small enough. The answer came from FPV drones: a tiny Caddx camera and TBS video transmitter that stream live video to the inspector.
Research on detection methods and Québec standards
Several concepts presented to the team and evaluated
Selection and integration of all electronics
3D-printed prototypes, before the move to metal.
Built, then validated
After plastic prototypes, the final parts were laser-fusion printed in metal. I soldered the electronics, assembled the system and tuned it during real-world trials.
Non-toxic tracers
Glue-free assembly
Modular design that makes repairs easier
Metal-printed version with the battery pack visible.
Designed to outlast my internship
I delivered the documentation anyone needs to operate, repair or reproduce the system: user guide, inspection protocol, settings guide and assembly guide.
Built on my Capstone Project III (110 h)
Put into service by the City in summer 2026
Test image inside a manhole: the tracer stands out clearly from the background.